  • Hi - yes, sorry about the delays.

    We're expecting those parts we need at the end of May now (we finally have a date) and have booked in assembly for 6th June, so all being well we should have them back in stock by 10th June.

    At the same time I'm also getting a slightly cheaper Puck.js Lite made (without the sensors) as a lot of people end up using the Puck just as a smart button/beacon. I'm expecting the production prototype of that tomorrow and as soon as I get that checked production should start - so I'd hope to see the Puck.js Lite a little earlier - hopefully the very end of May